Industry · Energy & Resources
Context
A unified ERP lets the asset register built during construction become the basis for operations, with costs and contracts tracked throughout.
01Operational challenges
Large equipment purchases and subcontracts without consolidated commitment tracking.
As-built asset data lost between construction and O&M.
Distributed assets with scheduled and corrective maintenance.
O&M fees, performance guarantees and availability-based payments.
02Core flows
03Industry workflows
Installed components recorded as assets at commissioning.
Component warranties and claims managed.
Schedules by asset type and manufacturer recommendation.
Contract terms tied to availability or generation data.
04 — Reporting
05 — Compliance
Grid connection requirements, environmental permits, health and safety at remote sites and incentive programme reporting. Store permits and inspection records against projects and assets.
Regulatory requirements vary by jurisdiction. We configure the system to support your obligations; confirm specific rules with your auditor or compliance advisor.
06 — Integrations
SCADA and monitoring platforms, GIS, project scheduling tools and document management are typical integrations.
07AI opportunities
Practical uses that sit on top of clean ERP data. None of them replace getting the core transactions right first.
Classify monitoring alerts into maintenance tasks.
Pull key terms from permits and contracts.
Identify components with recurring failures.
08ERP modules
09Roadmap
Budgets, commitments and procurement.
As-built assets at commissioning.
Maintenance and field service.
SCADA data driving work and billing.
10Common mistakes
Capture serials and configurations during construction.
Handover is easier in one system.
Track warranty terms to recover costs.
Spares at sites must be tracked.
Explore further
Insights
Who you need on an ERP implementation team: sponsor, project lead, key users, data owner, consultants and developers, with realistic time commitments.
Why ERP adoption fails and how to fix it: role-based training, key users, floor-level sessions, quick reference guides, and measuring adoption after go-live.
How to compare ERP consultants and implementation partners: references, delivery model, pricing, contract terms and questions that expose weak firms.
FAQ
Monitoring data can be integrated to trigger maintenance and inform contract reporting.
Yes, project costs can be capitalised into assets according to accounting policy.
Yes, against serialised assets and suppliers.