Skip to content
ERP Builders

Industry · Energy & Resources

Renewable energy ERP from development project to decades of O&M

Renewable energy companies span a long lifecycle: developing and building projects, then operating and maintaining assets for twenty years or more. Each stage has different needs — project costing and procurement during construction, asset management and maintenance afterwards.
  • M01Projects
  • M02Purchasing
  • M03Assets
  • M04Maintenance
  • M05Inventory
  • M06Accounting

Context

ERP in renewable energy

A unified ERP lets the asset register built during construction become the basis for operations, with costs and contracts tracked throughout.

01Operational challenges

What usually breaks before the ERP project starts

01

Project cost control

Large equipment purchases and subcontracts without consolidated commitment tracking.

02

Handover to operations

As-built asset data lost between construction and O&M.

03

Maintenance across sites

Distributed assets with scheduled and corrective maintenance.

04

Contract billing

O&M fees, performance guarantees and availability-based payments.

02Core flows

How the ERP should handle each part of the business

Sales flow
EPC contracts with milestone billing; O&M contracts with fixed and variable fees.
Procurement
Major components (turbines, modules, inverters, batteries) with long lead times and warranties.
Inventory
Spare parts by site and central store; serialised major components.
Warehouse
Spares logistics to remote sites.
Accounting
Project costing, capitalisation of assets, depreciation and contract revenue.
CRM
Landowners, offtakers, investors and stakeholders tracked.

03Industry workflows

Workflows specific to renewable energy

01

Project to asset

Installed components recorded as assets at commissioning.

02

Warranty tracking

Component warranties and claims managed.

03

Preventive maintenance

Schedules by asset type and manufacturer recommendation.

04

Performance-linked billing

Contract terms tied to availability or generation data.

04 — Reporting

Reports that should come out of the system, not a spreadsheet

  • Project budget vs commitments vs actuals
  • Asset availability and downtime
  • Maintenance cost per MW
  • Warranty claims status
  • Spare parts usage
  • Contract revenue

05 — Compliance

Compliance considerations

Grid connection requirements, environmental permits, health and safety at remote sites and incentive programme reporting. Store permits and inspection records against projects and assets.

Regulatory requirements vary by jurisdiction. We configure the system to support your obligations; confirm specific rules with your auditor or compliance advisor.

06 — Integrations

Systems the ERP needs to talk to

SCADA and monitoring platforms, GIS, project scheduling tools and document management are typical integrations.

07AI opportunities

Where AI is genuinely useful here

Practical uses that sit on top of clean ERP data. None of them replace getting the core transactions right first.

01

Alarm-to-work-order triage

Classify monitoring alerts into maintenance tasks.

02

Document extraction

Pull key terms from permits and contracts.

03

Failure pattern analysis

Identify components with recurring failures.

08ERP modules

Modules a typical deployment includes

  • M01Projects
  • M02Purchasing
  • M03Assets
  • M04Maintenance
  • M05Inventory
  • M06Accounting
  • M07Field Service
  • M08Documents

09Roadmap

Implementation roadmap

  1. 01

    Project controls

    Budgets, commitments and procurement.

  2. 02

    Asset register

    As-built assets at commissioning.

  3. 03

    O&M

    Maintenance and field service.

  4. 04

    Monitoring integration

    SCADA data driving work and billing.

10Common mistakes

Mistakes we see repeatedly

01

Losing as-built data

Capture serials and configurations during construction.

02

Separate project and O&M systems

Handover is easier in one system.

03

Ignoring warranties

Track warranty terms to recover costs.

04

Remote stock blind spots

Spares at sites must be tracked.

Insights

Related reading

ERP Implementation2 min read

ERP User Adoption: Training That Actually Works

Why ERP adoption fails and how to fix it: role-based training, key users, floor-level sessions, quick reference guides, and measuring adoption after go-live.

FAQ

Frequently asked questions

Can the ERP link to SCADA?

Monitoring data can be integrated to trigger maintenance and inform contract reporting.

Can we capitalise project costs?

Yes, project costs can be capitalised into assets according to accounting policy.

Can we track component warranties?

Yes, against serialised assets and suppliers.

Next step

Construction data lost at handover?

We will map project-to-asset in one system.