Skip to content
ERP Builders

Industry · Energy & Resources

Solar ERP for installers scaling from dozens to hundreds of projects

Residential and commercial solar installers grow fast and then hit a wall: leads in one tool, proposals in another, inventory in spreadsheets, installation scheduling on a whiteboard, and warranty claims nobody can trace to a serial number.
  • M01CRM
  • M02Sales
  • M03Projects
  • M04Inventory (Serials)
  • M05Purchasing
  • M06Field Service

Context

ERP in solar

Solar ERP connects the full journey — lead, site survey, proposal, permit, procurement, installation, commissioning, invoicing and service — around one project record.

01Operational challenges

What usually breaks before the ERP project starts

01

Lead-to-install handoffs

Sales hands over incomplete information to operations.

02

Component availability

Panels and inverters out of stock when installation is scheduled.

03

Permit tracking

Permit and interconnection status tracked manually.

04

Serial and warranty tracking

No record of which panels and inverters went to which site.

02Core flows

How the ERP should handle each part of the business

Sales flow
Leads qualified, site surveys scheduled, proposals with system design BOMs and financing options; contracts signed electronically.
Procurement
Panels, inverters, batteries and racking purchased against projects and stock forecasts.
Inventory
Serialised panels, inverters and batteries; kitting per project.
Warehouse
Project kits staged and delivered to site.
Accounting
Deposits and milestone payments; incentive and rebate tracking; project margin.
CRM
Lead sources, referral programmes and customer communication through the project.

03Industry workflows

Workflows specific to solar

01

Project stages

Survey, design, permit, install, inspection, interconnection and PTO tracked as stages.

02

System BOM

Design converted into a kit of components for procurement and picking.

03

Serial capture at install

Installed serials recorded against the customer site.

04

Service and warranty

Service tickets linked to installed components and warranties.

04 — Reporting

Reports that should come out of the system, not a spreadsheet

  • Pipeline by stage and source
  • Days in each project stage
  • Project margin
  • Inventory commitment vs availability
  • Installer crew utilisation
  • Warranty claims by component

05 — Compliance

Compliance considerations

Electrical codes, permitting and interconnection rules, incentive programme documentation and installer certifications vary by region. Store permits and inspection results with each project.

Regulatory requirements vary by jurisdiction. We configure the system to support your obligations; confirm specific rules with your auditor or compliance advisor.

06 — Integrations

Systems the ERP needs to talk to

Solar design tools, e-signature, financing partners, monitoring platforms and messaging tools are typical integrations.

07AI opportunities

Where AI is genuinely useful here

Practical uses that sit on top of clean ERP data. None of them replace getting the core transactions right first.

01

Utility bill extraction

Read customer utility bills to pre-fill consumption data for proposals.

02

Customer updates

Draft status updates at each project stage.

03

Permit document checks

Check permit packages for missing items.

08ERP modules

Modules a typical deployment includes

  • M01CRM
  • M02Sales
  • M03Projects
  • M04Inventory (Serials)
  • M05Purchasing
  • M06Field Service
  • M07Accounting
  • M08Sign

09Roadmap

Implementation roadmap

  1. 01

    Lead to contract

    CRM, surveys, proposals and e-signature.

  2. 02

    Projects and procurement

    Stages, kits and purchasing.

  3. 03

    Installation

    Crew scheduling and serial capture.

  4. 04

    Service

    Monitoring alerts and warranty tickets.

10Common mistakes

Mistakes we see repeatedly

01

Skipping serial capture

Warranty claims need serials per site.

02

Stages not standardised

Define stages and exit criteria.

03

Inventory ignored until install day

Reserve components at contract.

04

Disconnected design tool

Integrate designs to avoid re-keying BOMs.

Insights

Related reading

FAQ

Frequently asked questions

Can we import designs from our solar design tool?

Many design tools export BOMs that can be imported or integrated.

Can customers sign proposals online?

Yes, with e-signature integration.

Can we track installed serial numbers?

Yes, at component level per project and customer.

Next step

Growing faster than your systems?

We will map your lead-to-install process.